User:BRINGit34/EAOP: Difference between revisions

From Space Station 14 Wiki
(Created EAOP - Engi)
 
(EAOP V1 - Added some things from aurora)
Line 1: Line 1:
= Engineering & Atmospherics Operating Procedure =
= Engineering & Atmospherics Operating Procedure =
== Don't hammer in a screw ==
We at Nanotrasen respect the ingenuity and intelligence it requires to be an Engineer or member of Atmospherics, that is why we provide a simple and easy to follow procedure for our engineering members.
We expect a functioning station with power so that our other departments can operate at peak performance.
== Modifications to the Station ==
All non-structural forms of modification, optimization, or upgrades to station equipment are permitted so long as the modifying engineer is qualified and has obtained written permission from the head of the department in question. Large-scale structural modifications or additions require written and stamped consent from either the Chief Engineer, the Captain, or (in the absence of both) a delegated representative of Command staff.

Revision as of 15:47, 8 September 2024

Engineering & Atmospherics Operating Procedure

Don't hammer in a screw

We at Nanotrasen respect the ingenuity and intelligence it requires to be an Engineer or member of Atmospherics, that is why we provide a simple and easy to follow procedure for our engineering members.

We expect a functioning station with power so that our other departments can operate at peak performance.

Modifications to the Station

All non-structural forms of modification, optimization, or upgrades to station equipment are permitted so long as the modifying engineer is qualified and has obtained written permission from the head of the department in question. Large-scale structural modifications or additions require written and stamped consent from either the Chief Engineer, the Captain, or (in the absence of both) a delegated representative of Command staff.